HotelInfantesAgres - Tempat Tanya Jawab Pelajaran & Ilmu Pengetahuan Logo

In Matematika / Sekolah Menengah Atas | 2025-07-07

4 orang menggali selokan selama 7 hari. berapa orang diperlukan untuk menggali selokan selama 1/2 hari?

Asked by Aditrahman9379

Answer (4)

x=\frac{10*36}{9} \\ \\ \boxed{x=40 \$}"> x − t h e p r i ce o f t h e g i f t 10% o f x = 100 10 ​ ∗ x = 10 1 ​ ∗ x = 10 x ​ − t h e d i sco u n t x ( 10 − 10 x ​ = 10 10 x − x ​ = 10 9 x ​ − t h e n e w p r i ce 4 ∗ 9.00$ = 36$ − t h e p r i ce a f t er d i sco u n t 10 9 x ​ = 36 => x = 9 10 ∗ 36 ​ x = 40$ ​
the variant A.$40.00

Answered by mariamikayla | 2024-06-10

The original price of the gift was $40.00 before a 10% discount was applied, which means the sisters paid $36.00 after the discount. The answer choice is A. $40.00.
;

Answered by mariamikayla | 2024-12-24

Jawab: 56 pekerjaPenjelasan dengan langkah-langkah: 4 pekerja -----> 7 harix pekerja -----> 1/2 harikarena ini merupakan perbandingan berbalik nilai, maka persamaan akan menjadi:[tex]\frac{7}{1/2} = \frac{x}{4}[/tex] lalu dikali silang dan mendapatkan1/2x = 28kali 2 di masing masing ruas sehingga persamaan menjadi x=56

Answered by DarrenPratama | 2025-07-08

Diketahui4 orang menggali selama 7 hariDitanyaOrang yang diperlukan jika selama 1/2 hariDijawab1/2 = 0,54 x 7 = y x 0,528 = 0,5yy = 28/0,5y = 56KesimpulanMaka jawabannya 56.

Answered by aquila0152 | 2025-07-08